Front Desk Architects and Planners Forum
Metro Station Performance Requirements - Printable Version

+- Front Desk Architects and Planners Forum (https://frontdesk.co.in/forum)
+-- Forum: Architecture and Planning (https://frontdesk.co.in/forum/forumdisplay.php?fid=1)
+--- Forum: Study Resource (https://frontdesk.co.in/forum/forumdisplay.php?fid=114)
+--- Thread: Metro Station Performance Requirements (/showthread.php?tid=408)



Metro Station Performance Requirements - FDArchitects - 07-31-2014

Performance Requirements

Centralized control of the Station E&Ms.

All Stations shall have a dedicated central management unit of all major E&M equipment so that the maintenance staff can have control over them.

The equipment under local central command shall include the following as a minimum:

(i) The entrance closing gates of the Station;
(ii) lighting; and
(iii) escalators and lifts.

The local central management unit shall be the relay to the OCC

For dealing with Emergency, the control should also have the following:

(i)An Emergency procedure information system;
(ii)a means of monitoring fire detection systems;
(iii)a means of summoning Emergency services;
(iv)communication system;
(v)public address system;
(vi)a means of monitoring operation of lifts, escalators, ticket barriers and other equipments; and
(vii)CCTV monitoring of all Station areas.