Front Desk Architects and Planners Forum
Installation Of Termite Shields - Printable Version

+- Front Desk Architects and Planners Forum (https://frontdesk.co.in/forum)
+-- Forum: Architecture and Planning (https://frontdesk.co.in/forum/forumdisplay.php?fid=1)
+--- Forum: Study Resource (https://frontdesk.co.in/forum/forumdisplay.php?fid=114)
+---- Forum: Materials (https://frontdesk.co.in/forum/forumdisplay.php?fid=7)
+----- Forum: Pest control and Anti Termite Measures (https://frontdesk.co.in/forum/forumdisplay.php?fid=50)
+----- Thread: Installation Of Termite Shields (/showthread.php?tid=765)



Installation Of Termite Shields - sandeep jain - 08-19-2014

Installation Of Termite Shields

Termite shields may be installed round the periphery of a building where infestation of termite is high. Provision of metal shields takes care of external protection only.

For the metal shield to function effectively, it is essential that it is installed correctly and the shape of the shield shall be maintained properly which requires periodical inspection after installation.

At least 50 mm width of termite shield shall be properly embedded in the cement concrete sub-floor with 50 mm horizontal projection on the external side of the wall and further projection of 50 mm bent downwards at an angle of 45”. The 50 mm embedment of termite shield in concrete sub-floor facilitates its easy replacement whenever required .

[Image: shields.jpg]