Curing
#1

Curing

The process of maintaining moisture in the concrete is called curing. Concrete begins to dry after casting. So, the parts exposed to the environment should be cured to ensure that the concrete surface is never dry. This needs to be done continuously, till the mandated period of curing. Usually, 10-14 days of curing is considered optimal. It is best to make small curing ponds or bunds on flat or horizontal surfaces. For vertical surfaces, you may wrap jute or hessian cloth on the surface and then pour water onto it. This helps keep the surface wet for longer periods.
Reply


Messages In This Thread
Curing - by sunil zende - 10-14-2014, 11:18 AM
RE: Curing - by fdaforum - 08-24-2018, 09:54 AM
RE: Curing - by Manish Jain - 09-10-2018, 02:52 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)