09-10-2018, 02:48 PM
Steps of Concrete Construction
The construction steps are:
The construction steps are:
- Selecting quantities of materials for selected mix proportion
in M20 concrete grade mix ratio is 1 : 1.5 : 3 here 1 is the ratio of cement, 1.5 is the ratio of sand and 3 is the ratio of coarse aggregate based on volume or weight of materials and this grade have commpresive strength of 20 MPa - Mixing
Hand Mixing : • Small jobs • Inferior mixing • Low quality concreteMachine Mixing • Good mixing • Large works Concrete mixers • Tilting mixers • Non-tilting mixers • Reversing drum mixers • Pan type or stirring mixers • Transit mixer - Checking of workability
- Transportation
• Mortar pan • Wheel barrow • Chutes • Dumper • Bucket and Ropeway • Belt conveyor • Skip and Hoist • Pumping - Pouring in formwork for casting
Preserve concrete quality Water-cement ratio Slump Air-content Homogeneity Avoid separation of aggregate and mortar Avoid excessive horizontal movement Consolidate adequately Maintain sufficient placement capacity Choose the right equipment for the concrete - Vibrating for proper compaction
External Vibration Form vibrators Vibrating tables Surface vibrators Vibratory screeds Plate vibrators Vibratory roller screeds Vibratory hand floats or trowels - Removal of formwork after suitable time
- Curing member with suitable methods and required time.