06-02-2019, 08:01 AM
Lift lobbies
•All obstruction to traffic flow , particularly from passers-by , should be eliminated
•Cleary visible Ground floor lift lobby from main entrance of the building
![[Image: image-7.png]](http://frontdesk.co.in/wp-content/uploads/2019/06/image-7.png)
Preferred and acceptable arrangements of lift
![[Image: image-8.png]](http://frontdesk.co.in/wp-content/uploads/2019/06/image-8.png)
Not recommended
To read more ... http://frontdesk.co.in/building-services...portation/
•All obstruction to traffic flow , particularly from passers-by , should be eliminated
•Cleary visible Ground floor lift lobby from main entrance of the building
![[Image: image-7.png]](http://frontdesk.co.in/wp-content/uploads/2019/06/image-7.png)
Preferred and acceptable arrangements of lift
![[Image: image-8.png]](http://frontdesk.co.in/wp-content/uploads/2019/06/image-8.png)
Not recommended
- Main entrance should not visible for passenger within the lift car. To ensure that car are not kept waiting
- Noise generated by lift machinery and cars should be considered in relation to sensitive areas
- Plan for service core and there is buffer zone between lift lobby and the occupied space
To read more ... http://frontdesk.co.in/building-services...portation/