1. Notification by Govt. / Local Authority:
i. Name of Town , ii. Horizon year , iii. Revenue Villages covered. iv. Agency for plan preparation.
2. Further actions are taken by the Agency authorised to prepare Master Plan:
i. Reconnaissance Survey , ii. Formation of teams
3. Identification of data needs and surveys
Preparation of existing land use map
4. Collection of Data
1. Primary Surveys o Transportation Survey o Socio Economic Sample Survey
2. Secondary Surveys
o Census of India o District Gazetteer o Line Departments
5. Data Analysis: (Assessment of existing conditions.)
6. Projections: (Assessment of future requirements.)
Projections done for 20 years (Horizon year) and also for intermediate years.
7. Stakeholder’s Meeting (Optional) :
· All the departments related with Urban Development and Governance and citizen forum groups are invited.
· Data Analysis & Projections are presented before them.
· Views, aims and objectives are obtained.
· Goals, aims and objectives, policies are defined.
8. Preparation of Master Plan in Draft form.
9. Public objections / Suggestions on Draft plan.
10. Hearing of public objections & finalizing the same.
11. Finalization of Master Plan in the light of objection / Suggestion report.
12. Preparation of Final report and Maps.
13. Notification of Master Plan.
Planning Legislations Study notes for M. plan Sem-II
Register as member and login to download attachment [pdf] by right-click the pdf link and Select “Save link as” use for Educational Purposes Only
Information on this site is purely for education purpose. The materials used and displayed on the Sites, including text, photographs, graphics, illustrations and artwork, video, music and sound, and names, logos, IS Codes, are copyrighted items of respective owners. Front Desk is not responsible and liable for information shared above.