Identification of land for water infrastructure is an essential parameter. It is necessary to earmark land for Water Treatment Plant (WTP) in Development Plans. Also land for overhead reservoirs, pumping stations should be marked at the zonal level or local area plan level. However land requirement may vary based on the capacity of WTPs and up‐gradation of technology. Below is the table, which recommends land requirement based on different capacity.

Recommended land Requirement based on capacities as par CPHEEO.

S.No.   Identified Capacities   Land Requirement   (Hectares)

1   5 MLD   0.10

2   10 MLD   0.19

3   50 MLD   0.93

4   100 MLD   1.87

5   200 MLD   3.73

6   500 MLD   9.34

Note: Additional 0.63 ha of land can also be considered for staff quarters

Register & Download PDF for Educational Purposes Only

Urban Infrastructure and Network Study notes for M. plan Sem-III

.pdf

Urban Infrastructures & Network.pdf

Register as member and login to download attachment [pdf] by right-click the pdf link and Select “Save link as” use for Educational Purposes Only

Disclaimer

Information on this site is purely for education purpose. The materials used and displayed on the Sites, including text, photographs, graphics, illustrations and artwork, video, music and sound, and names, logos, IS Codes, are copyrighted items of respective owners. Front Desk is not responsible and liable for information shared above.

Leave a Reply

Your email address will not be published. Required fields are marked *